Contemporary Refurbishment - Welbeck Way
Client
Aria
Location
London
Duration
8 weeks
Value
£450,000
Having previously completed a renovation of a few floors within the building, Krypton were invited back to completely strip out, alter, and refurbish the 2nd floor of this central London clinic located just off Harley Street.
Project Profile
The refurbishment required isolation and strip out of existing space and services, installation of new M&E services providing general lighting and feature lighting, cooling, heating, DB rated acoustic walls and ceilings to mitigate sound transfer between consulting rooms.
The contemporary space was created incorporating oak flooring, glazed screens, joinery to doors and bespoke cabinetry. It was brought to life with the installation of tastefully designed FF&E, installed to provide a quality warm and welcoming space.
Challenge & Solution
Due to the first and third floors of the building being live theatres and offices, we programmed potentially disruptive works around the tenants requirements. A key part of the programme was the connection of the plumbing to the existing pipework on the floor below, and to do this, we needed access to the live theatre. To minimise disruption to theatre use, we programmed this out of hours with prior consent from the tenants.