Full Refurbishment - The Lord Nelson Pub

Client

Star Pubs

Location

MillWall

Duration

5 weeks

Value

£115,000

Krypton were appointed by Star Pubs to undertake a refurbishment of their Lord Nelson pub in Millwall, London. 

Project Profile

Krypton’s primary role was to undertake fabric repairs to the building which included brick replacement, repointing, lintel and coping replacement works. 

 

Alongside the façade repair works, Krypton completed the waterproofing works to allow an internal fit out to commence following. Krypton worked closely with our waterproofing specialist and the client team to ensure that system proposed was fit for purpose and gave the client an insurance backed warranty, requested.

 

 

Challenge & Solution

Once the enabling works were complete. Krypton proceeded within internal repair works to give the bar a near lease of life ahead of the Euro 2024 Football competition. These works were to be completed to a tight deadline which required meticulous planning and collaborative working with our client. The works involved the full re-decoration of the bar areas along with repairs to the floor finishes and minor mechanical and electrical works. 

 

See More Like This ....

Screenshot-2024-02-20-at-08.01.09WEB
welcome-to-the-lord-nelson
001ae951b83a4d1cabdcacd1865993d5

Full Refurbishment - The Lord Nelson Pub

Client

Star Pubs

Value

£115,000

Duration

5 weeks

Location

MillWall

Krypton were appointed by Star Pubs to undertake a refurbishment of their Lord Nelson pub in Millwall, London.

Project Profile

Krypton’s primary role was to undertake fabric repairs to the building which included brick replacement, repointing, lintel and coping replacement works. 

 

Alongside the façade repair works, Krypton completed the waterproofing works to allow an internal fit out to commence following. Krypton worked closely with our waterproofing specialist and the client team to ensure that system proposed was fit for purpose and gave the client an insurance backed warranty, requested.

 
Challenge and Solution

Once the enabling works were complete. Krypton proceeded within internal repair works to give the bar a near lease of life ahead of the Euro 2024 Football competition. These works were to be completed to a tight deadline which required meticulous planning and collaborative working with our client. The works involved the full re-decoration of the bar areas along with repairs to the floor finishes and minor mechanical and electrical works. 

Screenshot-2024-02-20-at-08.01.09WEB
welcome-to-the-lord-nelson
001ae951b83a4d1cabdcacd1865993d5

Enquire now

If you’re looking for more information, need to talk to someone about an enquiry or want to chat about your service needs, then you’ve come to the right place.

Please fill in our form and a member of our team will be in touch.