Full Refurbishment - The Lord Nelson Pub
Client
Star Pubs
Location
MillWall
Duration
5 weeks
Value
£115,000
Krypton were appointed by Star Pubs to undertake a refurbishment of their Lord Nelson pub in Millwall, London.
Project Profile
Krypton’s primary role was to undertake fabric repairs to the building which included brick replacement, repointing, lintel and coping replacement works.
Alongside the façade repair works, Krypton completed the waterproofing works to allow an internal fit out to commence following. Krypton worked closely with our waterproofing specialist and the client team to ensure that system proposed was fit for purpose and gave the client an insurance backed warranty, requested.
Challenge & Solution
Once the enabling works were complete. Krypton proceeded within internal repair works to give the bar a near lease of life ahead of the Euro 2024 Football competition. These works were to be completed to a tight deadline which required meticulous planning and collaborative working with our client. The works involved the full re-decoration of the bar areas along with repairs to the floor finishes and minor mechanical and electrical works.
See More Like This ....



Full Refurbishment - The Lord Nelson Pub
Client
Star Pubs
Value
£115,000
Duration
5 weeks
Location
MillWall
Krypton were appointed by Star Pubs to undertake a refurbishment of their Lord Nelson pub in Millwall, London.
Project Profile
Krypton’s primary role was to undertake fabric repairs to the building which included brick replacement, repointing, lintel and coping replacement works.
Alongside the façade repair works, Krypton completed the waterproofing works to allow an internal fit out to commence following. Krypton worked closely with our waterproofing specialist and the client team to ensure that system proposed was fit for purpose and gave the client an insurance backed warranty, requested.
Challenge and Solution
Once the enabling works were complete. Krypton proceeded within internal repair works to give the bar a near lease of life ahead of the Euro 2024 Football competition. These works were to be completed to a tight deadline which required meticulous planning and collaborative working with our client. The works involved the full re-decoration of the bar areas along with repairs to the floor finishes and minor mechanical and electrical works.