Using our detailed knowledge of external repairs, we worked with Waitrose to complete this project on budget and to programme.

Project Profile

These works comprised car park maintenance works within an existing store. We conducted a liquid repair to the existing car park deck, investigative works and all associated repairs. We also conducted minor roof works which were completed in a methodical manner ensuring that whatever roofing finishing was removed, was made watertight in the same day. Krypton facilitated the store’s fire escape and operational routes through our site, ensuring our area of works were suitably segregated and protected. 

See More Like This ....

Parapet Remedial Works - John Lewis Welwyn
Phase 2 of an external façade maintenance package delivered over a twelve week period. ​
View Case Study
The Lord Nelson Pub
A full refurbishment of the pub, including both internal and external works.
View Case Study
The Constitution Pub
A full pub refurbishment including both internal and external works.
View Case Study

External Repair Works - Waitrose Saffron Walden

Client

Waitrose

Value

£65,000

Duration

4 weeks

Location

Saffron Walden

Using our detailed knowledge of external repairs, we worked with Waitrose to complete this project on budget and to programme.

Project Profile

These works comprised car park maintenance works within an existing store. We conducted a liquid repair to the existing car park deck, investigative works and all associated repairs.

 

We also conducted minor roof works which were completed in a methodical manner ensuring that whatever roofing finishing was removed, was made watertight in the same day.

 

Krypton facilitated the store’s fire escape and operational routes through our site, ensuring our area of works were suitably segregated and protected.

See More Like This ....

Parapet Remedial Works - John Lewis Welwyn
Phase 2 of an external façade maintenance package delivered over a twelve week period. ​
View Case Study
The Lord Nelson Pub
A full refurbishment of the pub, including both internal and external works.
View Case Study
The Constitution Pub
A full pub refurbishment including both internal and external works.
View Case Study

Enquire now

If you’re looking for more information, need to talk to someone about an enquiry or want to chat about your service needs, then you’ve come to the right place.

Please fill in our form and a member of our team will be in touch.