Client

Ramsay Healthcare

Duration

6 weeks

Value

£125,000

Location

Hertfordshire

A project utilising existing external space to create parking and a hardstanding to facilitate a much-needed mobile imaging unit for our client Ramsay Health Care.   

 

Works comprised the removal of an outbuilding and ground clearance to make way for the new hardstanding and parking area. Following ground clearance, a reduced level dig was carried out with the alteration of existing drainage. Trench works were carried out across the site to facilitate the installation of service ducts for the new electrical supplies to feed the imaging unit.  

 

Once drainage alterations were completed the subbase was prepared, formwork and steel reinforcement installed, and the concrete slab poured in accordance with our structural engineers design. Final block paving and bollards were then placed to create the new MRI facility.

 

To maintain safe access whilst we were creating the new space at the entrance, we employed a logistics manager to ensure the safe delivery of plant and materials as well as manage the installation of electrical services in the entrance road of the hospital. These were installed via trenches and duct work, dug out of hours and covered with road plates to maintain access.

4M0A6024
4M0A6028
4M0A6036

Enquire now

If you’re looking for more information, need to talk to someone about an enquiry or want to chat about your service needs, then you’ve come to the right place.

Please fill in our form and a member of our team will be in touch.